POLITICAL RECORDSTHE VOTE AND THE FILING
U.S. Congress · committee

U.S. S 3316

WATER Act of 2025 · 119th Congress · Introduced Dec 3, 2025 · Latest action Dec 3, 2025

Official title

WATER Act of 2025

Official page
What it actually does · title matches the text

The WATER Act creates a new program that lets a state take over some of the federal duties for approving big construction projects like highways, railroads, and public‑transportation work that affect rivers and other navigable waters. Within 60 days, the Army’s Chief of Engineers and the EPA head must set up the program. If a state agrees in writing, it can handle the permits for dumping fill material, doing environmental reviews, and following other federal water‑law rules, but it must follow the same procedures the federal agency would. The state does not have to write new regulations, and the federal government still keeps any duties the state does not take on.

  • Rule: Establishes the "Waterway Permit Section 404 Assignment program" allowing states to assume federal permitting duties for covered projects.
  • Duty: States that assume responsibilities must follow the same procedural and substantive requirements the federal agencies would use.
  • Exception/Limitation: Assignment is optional, applies only to specific "covered projects," and is limited to what is needed for permitting those projects.
  • Who gains: States gain more control and potentially faster permitting for infrastructure projects within their borders.
  • Who loses: Federal agencies (EPA Administrator and the Army Corps of Engineers) lose some authority over Section 404 and Rivers and Harbors permitting for those projects.
  • No new regulations: Participating states are not required to create new regulations to carry out the program.
  • Timeline: The program must be established and operational within 60 days after the law is enacted.

Title check: The official title "WATER Act of 2025" (Water Authority and Timely Environmental Review Act) accurately reflects the bill’s purpose of creating a waterway permitting program and assigning environmental review responsibilities, so the title matches the content.

AI-generated read, not yet human-reviewed · How these reads are made

Name in the news

No sourced news or social name stored. This page will not invent one.

How members voted

No roll call is stored on this bill yet.

PersonPartyVote
No individual votes stored on this bill.