Connect the Grid Act · 119th Congress · Introduced Feb 26, 2026 · Latest action Feb 26, 2026
The Connect the Grid Act would change some federal power laws so that Texas’s electric grid (ERCOT) can be linked to neighboring power regions. It removes special exemptions for ERCOT, requires the Energy Commission to set new rules that guarantee a certain amount of power can flow between Texas and three other grid areas, and orders plans to build new transmission lines (or upgrade existing ones) by Jan. 1, 2037. The plans must prioritize using existing roads or rail corridors, damaged land, renewable‑energy sites, and new grid‑enhancing technology.
- Rule: Deletes ERCOT‑specific exemptions in the Federal Power Act, making it subject to the same federal rules as other utilities.
- Duty: Requires the Federal Energy Regulatory Commission (FERC) to issue a reliability standard that sets minimum power‑transfer limits between ERCOT and three neighboring grid operators (SPP, MISO, and the Western Interconnection).
- Duty: Forces ERCOT and the neighboring operators to submit joint plans for building or upgrading transmission lines to meet those limits, with a deadline of Jan. 1, 2037.
- Exception/priority: The transmission‑building plans must first try to use existing rights‑of‑way, degraded land, and renewable‑energy sites, and must include grid‑enhancing technologies.
- Who gains/loses: Texas consumers could get more reliable power and access to cheaper/wider‑area energy, while ERCOT loses its current exemption status and may face higher costs for new transmission projects.
Title check: The official title ‘Connect the Grid Act’ accurately describes the bill’s main purpose of interconnecting Texas’s grid with neighboring grids.
AI-generated read, not yet human-reviewed · How these reads are made
No sourced news or social name stored. This page will not invent one.
How members voted
No roll call is stored on this bill yet.
| Person | Party | Vote |
|---|---|---|
| No individual votes stored on this bill. | ||