U.S. S 4559
Officer John Barnes Act · 118th Congress · Introduced Jun 17, 2024 · Latest action Jun 17, 2024
The Energy Cost Fairness and Reliability Act of 2026 would tell the Federal Energy Regulatory Commission (FERC) to make new rules about how big power users—like data centers and large factories—connect to the national electricity grid. The goal is to make sure the grid stays reliable, keep electricity prices from rising too fast, and help the U.S. stay a leader in technology. The bill defines terms like “colocated” (when a big user is attached to a power plant), “curtailable” (when a big user can cut back or shift its power use when asked), and “demand flexibility” (the ability to change how much power is used). It also says the Department of Energy will work with FERC on these rules.
- Rule: Requires FERC to issue a final rule on interconnecting large load facilities to the transmission system.
- Duty: Large load facilities must be able to reduce or shift demand when the grid needs it (curtailable/demand flexibility).
- Definition: Clarifies terms like “colocated,” “curtailable,” and “demand flexibility” for large users.
- Who gains: The overall power grid’s reliability and stability, and potentially lower electricity rate increases for residential consumers.
- Who may lose: Large load facilities that cannot easily cut or shift power use may face new operational constraints or costs.
Title check: The official short title, "Energy Cost Fairness and Reliability Act of 2026," accurately reflects the bill’s purpose to address fairness of electricity costs and reliability of the grid by regulating large load facility interconnections.
AI-generated read, not yet human-reviewed · How these reads are made
No sourced news or social name stored. This page will not invent one.
How members voted
No roll call is stored on this bill yet.
| Person | Party | Vote |
|---|---|---|
| No individual votes stored on this bill. | ||