Texas HB 193
Relating to the volume of groundwater production authorized through the issuance of permits by a groundwater conservation district. · 892 session · Introduced Aug 18, 2025 · Latest action Aug 21, 2025
Relating to the volume of groundwater production authorized through the issuance of permits by a groundwater conservation district.
Official pageThis bill would let a local groundwater conservation district decide how much groundwater can be taken out, by giving out permits that say how much water each user can pump.
- Rule: Sets limits on groundwater volume through permits.
- Duty: The groundwater conservation district is responsible for issuing those permits.
- Exception: No specific exceptions or special cases are described in the text.
- Who gains: Not identified in the available text.
- Who loses: Not identified in the available text.
Title check: The title and the only provided text both state that the bill deals with the volume of groundwater production authorized by permits issued by a groundwater conservation district, so the title accurately reflects the content.
AI-generated read, not yet human-reviewed · How these reads are made
No sourced news or social name stored. This page will not invent one.
How members voted
No roll call is stored on this bill yet.
| Person | Party | Vote |
|---|---|---|
| No individual votes stored on this bill. | ||