Mississippi HB 1866
Appropriation; MDOT to hire consultant for study on most efficient design of a certain corridor along MS Hwy 305 in DeSoto County. · 2025 session · Introduced Feb 25, 2025 · Latest action Feb 26, 2025
Appropriation; MDOT to hire consultant for study on most efficient design of a certain corridor along MS Hwy 305 in DeSoto County.
Official pageThe bill would set aside state money so the Mississippi Department of Transportation (MDOT) can hire a consultant to study the most efficient way to design a specific road corridor on Mississippi Highway 305 in DeSoto County.
- Appropriates public funds for a consultant study, which means taxpayers will pay for the project.
- Targets the design of a corridor on MS Hwy 305, potentially affecting traffic flow, safety, and local development.
- Aims to find the most efficient (cost‑effective, safe, and functional) design, which could influence future construction decisions.
- Benefits drivers and residents in DeSoto County who will use the improved corridor.
- Could limit funds available for other state projects because money is earmarked for this study.
- No clear exceptions or limits are mentioned; the study would be conducted as directed by MDOT.
Title check: The title precisely describes the bill’s purpose—an appropriation for MDOT to hire a consultant to study the most efficient design of a corridor on MS Hwy 305 in DeSoto County.
AI-generated read, not yet human-reviewed · How these reads are made
No sourced news or social name stored. This page will not invent one.
How members voted
No roll call is stored on this bill yet.
| Person | Party | Vote |
|---|---|---|
| No individual votes stored on this bill. | ||