Michigan SB 931

Public utilities: electric utilities; new electronic transmission infrastructure; require to use existing rights-of-way. Amends sec. 7 of 1995 PA 30 (MCL 460.567). · 2025-2026 session · Introduced Apr 23, 2026 · Latest action Apr 23, 2026

Official title

Public utilities: electric utilities; new electronic transmission infrastructure; require to use existing rights-of-way. Amends sec. 7 of 1995 PA 30 (MCL 460.567).

Official page
What it actually does · title matches the text

This bill says that electric companies building new power lines have to use the land corridors they already have permission to use, instead of making new corridors.

  • Rule: Electric utilities must use existing rights‑of‑way for any new transmission infrastructure.
  • Duty: Utilities must plan and construct new lines within the limits of current easements or corridors.
  • Exception: The text does not mention any exceptions; all new electric transmission must follow this rule.
  • Who gains: Property owners and communities that would otherwise lose land to new rights‑of‑way may keep their land unchanged.
  • Who loses: Electric utilities may have less flexibility in choosing optimal routes, which could affect costs or speed of projects.

Title check: The title clearly states that the bill is about electric utilities building new transmission infrastructure and requiring the use of existing rights‑of‑way, which is exactly what the bill text says.

AI-generated read, not yet human-reviewed · How these reads are made

Name in the news

No sourced news or social name stored. This page will not invent one.

How members voted

No roll call is stored on this bill yet.

PersonPartyVote
No individual votes stored on this bill.